| Material |
Aluminium Alloy (T6-6061) |
Plywood, Timber & MS |
| Cycle Time |
7-9 days slab cycle |
15-18 days slab cycle |
| Surface Finishing |
Excellent - Plastering not required |
Rough - Plastering required |
| Pouring |
Pour column, beam, wall & slab in one go |
Can't pour all together |
| Formwork Pre-Planning |
Required |
Not Required |
| Wastage of Material |
Very Less |
In Great Amount |
| Accuracy in Construction |
Accurate Construction |
Less Accurate |
| Removing of Slab Forms Without Props |
Possible |
Not Possible |
| Repetition |
200–250 times |
Maximum 15 times |
| High-Rise Suitability |
Most Suitable |
Not Suitable |
| Economy in Construction |
Economical for Mass |
Economical on Small Scale |
| Skilled Labour |
Not Required |
Required |
| Environment Friendly |
Yes |
No |